References
Logistics Facilities
Year | Project Title / Cooperating Partner | Client |
2014 - 2015 |
EFRE – expansion stage of intermodal Terminal Glauchau: supplement of the intermodal terminal with a gantry crane and additional terminal infrastructure | GVZ Entwicklungsgesellschaft Südwestsachsen mbH |
scope of services: The LUB Consulting GmbH takes over the commercial project management of the above-mentioned project for the supplement of the intermodal terminal with a gantry crane and additional infrastructure |
||
|
||
2012 - 2014 | Grant application for private railway sidings (SGFFG, Germany) and professional support (project management, representation of builders) to reactivate the railway siding at the HaGe-location in Neubrandenburg |
Hauptgenossenschaft Nord AG |
scope of services: The object of the order was to apply for funding for reactivation and extension of the existing railway tracks. The funds were successfully applied. Since then the LUB supports the construction project from a technical perspective (project management, builder representation) and is responsible for the verification in the coming years. |
||
|
||
2009 - 2014 | Project management for the construction of a transfer point rail-road for grains and feedstuffs | HaBeMa Futtermittel GmbH & Co. KG, Hamburg |
scope of services: Locational analysis/ comparison of alternatives, detailed land availability assessment of the location, analyse of road and rail accessibility as well as development of media technology (Masterplan). The Coordination of the infrastructure connection agreement with DB Netz, coordination of the plot purchase contracts, coordination with licensing authorities etc. | ||
|
||
since 1998 | Management of the GVZ-Gesellschaft mbH or DGG In collaboration with: ISL Bremen | Deutsche GVZ-Gesellschaft mbH |
scope of the services: Since 1998 the LUB together with ISL Bremen has taken over the management of the umbrella organisation of the German Freight Villages. The DGG is both a point of contact for the politic at regional, national and EU level and active in research and consulting projects (www.gvz-org.de). | ||
|
||
since 1997 |
Development and project management for the construction of freight village (GVZ) in Dresden | GVZ-Entwicklungsgesellschaft Dresden mbH |
scope of services: conceptual development of a freight village at the site of the former RAW including the establishment potential, development of traffic and of media technology also as client-individual layout design; implementation of comprehensive project management tasks and representation of builders during the planning, approval and building phase. (www.gvz-dresden.de) | ||
|
||
2012 - 2014 |
Bechmarking for selected freight villages in Germany, in collaboration with: ISL Bremen | Funded by the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety |
scope of services: The aim of the project was to increase energy efficiency, to identify energy-saving measures in German GVZ (freight villages) and to share this knowledge with other GVZ (freight villages). Interviews with the GVZ-Entwicklungsgesellschaften and other companies in the GVZ (freight villages) was used for this purpose. | ||
|
||
2012 - 2013 |
Masterplan and business concept development for the freight village in the region Kaluga (Russia) | Deutsche GVZ-Gesellschaft mbH / Freight Village Kaluga JSC |
scope of services: In 2012 the LUB Consulting GmbH was commissioned to evaluate the master plan and business model of the Freight Village Kaluga situated to the south of Moscow. The following items were the main focuses in the development of the freight village in the planning region in Kaluga: recommendation for product and settlement policy, master plan including development planning, zoning regarding the types of use, dimensioning of plots and buildings according to the building and planning regulations, dimensioning of container transhipments terminal, business planning with recommendations for operating model, cost estimation and economic analysis as well as investment calculation using different methods for the container transhipments terminal, as well as the development of a Balanced Scorecard (BSC) for the strategic direction of the freight village and for the performance assessment. | ||
|
||
2010 - 2014 |
Falkenberg Waggon and Logistics Centre | BLG AutoRail GmbH, Mainz / BLG RailTec GmbH, Falkenberg/Elster |
scope of services: The train formation yard and maintenance of waggons and repair of trains for BLG AutoRail Gmbh and third parties should be developed in Uebigau/Falkenberg. The usage model for this location provides the functions for waggon parking and back up, train composition as well as preventive inspection, service and maintenance. The activities of LUB included capacity determination on the base of transport concept, coordination of the overall project, coordination with DB Netz (safety systems, operating technology) as well as with specialist planners and contractors. | ||
|
||
2010 - 2013 |
The process-oriented model for management support upon the occurrence of accident, in collaboration with: ISL Bremen and Emons Spedition GmbH | Federal Ministry of Education and Research (BMBF) |
scope of services: research, configuration and exemplary implementation of an emergency concept (Interim concept) for initiating and maintaining of the flows of goods in case of terrorist attacks or other unforeseen incidents, for the example the FV Bremen in cooperation with the FV Dresden. | ||
|
||
2010 - 2012 |
The effects of freight villages in Germany, in collaboration with: ISL Bremen | Federal Ministry of Transport, Building and Urban Affairs |
scope of services: The subject of the report was the analysis of traffic-related, economic and environmental effects associated with the implementation of Freight Villages (FV). The report is intended to contribute to the implementation of the 4D measure "initiative for City Logistics" of the plan for freight transport and logistics, including the effects of FV as interfaces for logistic supply services in cities. | ||
|
||
2010 |
Elaboration of railway traffic design concept for inter-municipal business park Kühnsdorf, in collaboration with: ISL Bremen | Freight Village Dresden/municipality Eberndorf (Austria) |
scope of services: The Kühndorf / Carinthia railway station is an important locational factor for the proposed inter-municipal business park that will provide the attractive conditions for intensive transport service and manufacturing companies with its convenient location to both the motorway and the railway main line (Koralmbahn). For this purpose, a master plan was created. | ||
|
||
2010 |
Feasibility studies for the trimodal transhipment facilities in the port Arneburg | City Arneburg/Elbe |
scope of services: The object of the feasibility study was to investigate the technological and economic feasibility of a port of transshipment with its own harbor loading equipment. For this purpose, the potential and the requirements of the local companies were acquired and the dimensions and technical configuration of the trimodal transhipment facilities were derived. Further variants were evaluated for an operator model. | ||
|
||
2009 - 2012 |
bimodal AGRO-Terminal Heidenau/Saxony | HaBeMa Futtermittel GmbH & Co. KG, Hamburg |
scope of services: Project development and management, as well as client representation for the construction of transhipment facility for grain and feed (incl. Reactivation of an industrial main track to a railway siding). The scope of services of the LUB includes: locational analysis/ comparison of alternatives, detailed land availability assessment of the location, analyse of road and rail accessibility as well as development of media technology (Masterplan). The Coordination of the infrastructure connection agreement with DB Netz, coordination of the plot purchase contracts, coordination with licensing authorities etc. | ||
|
||
2008 |
The marketing concepts for the logistics location ALPLOG, in collaboration with: ISL Bremen | Entwicklungsagentur Kärnten GmbH |
scope of services: Development of a marketing concepts for the logistics site ALPLOG (Villach-Fürnitz) taking into consideration the expansion of it:
|
||
|
||
2008 |
Logistics Centre Prilesie (Minsk), in collaboration with: ISL Bremen | FLLC Prilesie, Minsk |
scope of services: The following items were the main focuses in the development of the freight village in the planning area in in Minsk/Belarus:
|
||
|
||
2007 - 2008 |
Development of the Logistics Zone Wilhelmshaven, in collaboration with: ISL Bremen and IPG Potsdam | JadeWeserPort Entwicklungsgesellschaft mbH |
scope of services: consultancy services related to strategic conceptual design of the planning area in Wilhelmshaven. The following items were the main focuses:
|
||
|
||
2007 |
Master plan freight logistics village Thriassio (Athen), in collaboration with: ISL Bremen | DUSS GmbH |
scope of services: Participation in the development of a master plan and business plan for the freight village in Athens as well as consultancy services for a bidding consortium for the realization of the freight village | ||
|
||
2000 - 2006 |
Concept and project management for the intermodal terminal for combined transport in the freight village Dresden | GVZ-Entwicklungsgesellschaft Dresden mbH |
scope of services: The completion of the freight logistics village Dresden-Friedrichstadt with a transshipment station for combined transport. After taking the project management the following tasks were realised:
|
Logistics Concepts
Year | Project Titel / Cooperating Partner | Client |
2014 - 2015 |
Study: Identifying of specific transfer potential in intermodal transport taking into consideration the Trans-European corridors in Berlin-Brandenburg - identification, specification and preparatory implementation | ZukunftsAgentur Brandenburg GmbH |
scope of services:
|
||
|
||
2013 |
'Analysis of a new intermodal transport offer between Villach/Fürnitz and Venedig' , for the EU-Project Baltic-Adriatic Transport Cooperation (BATCo) | Deutsche GVZ-Gesellschaft mbH |
scope of services: Between 2010 and 2013 the LUB was involved in the BATCo project. In this context, in 2013 a feasibility study was developed for a new intermodal transport offer between Villach / Fürnitz and Venice. Firstly, a potential analysis was carried out, including the determination of rail potentials in Austria and Italia. The result of the analysis was a development of reliable market research, including operating concept for the new train connection. After the assessment of the potential, the technical and organizational requirements were analysed. | ||
|
||
2013 |
Feasibility study for intermodal connection Rostock-Prague (updating and continuation of the project 2007) | Hafen-Entwicklungsgesellschaft Rostock mbH |
scope of services:
|
||
|
||
2011 - 2013 |
EU Project FLAVIA - Freight and Logistics Advancement in Central/South-East Europe - Validation of trade and transport processes, Implementation of improvement actions, Application of co-coordinated structures |
GVZ-Entwicklungsgesellschaft Südwestsachsen mbH |
scope of services: The LUB developed two feasibility studies to connect the regional freight villages of the FLAVIA-Corridor. LUB was the "Work Package Leader" for the WP "terminal cooperation and development".
|
||
|
||
2011 |
Market study on ‚Rail Motorway services’ (Road Rail), between the Port of Calais and Germany, the Benelux and Eastern Europe | Port de Calais |
scope of services: The port Calais plans to create new and sustainable offers for hinterland transport. For this project the LUB Consulting GmbH was commissioned to draw up a market analysis. The task was to analyse the volume of freight traffic and freight flows across the Armel Channel (Ärmelkanal), in particular through the port of Calais. For this purpose the potential of Calais for intermodal transport relationship should be estimated. The analysis of mainly transported goods, businesses companies and transport chains was another part of the market analysis. As a result, a detailed market analysis could be offered, including a price range and numerous recommendations for 'Rail Motorway Service '. The project was realised together with the French consulting company JMJ Conseil. | ||
|
||
2010 - 2011 |
HINTERPORT (Common Learning Action Marco Polo II) Promotion of hinterland transport cooperative solutions for integrated operation of sea-inland ports, in collaboration with: ISL Bremen |
Deutsche GVZ-Gesellschaft mbH, Emons Spedition GmbH |
scope of services: Professional and organisational support for the client. 17 partners from 9 EU countries were involved. The aim was to build a network of seaports, transport operators and freight villages or intermodal terminal operators, to identify the positive examples of the hinterland transport relocation and to check the transferability to other transport corridors. | ||
|
||
2010 |
Freight conception Saxony sub-project C: evaluation of the location and accessibility of intermodal terminals and Railports | LISt Gesellschaft für Verkehrswesen und ingenieurtechnische Dienstleis-tungen mbH |
scope of services: Evaluation of the location, the accessibility of intermodal terminals and Railports in Saxony as a sub-project C of the Freight conception Saxony. This sub-project comprehends the allocation of potentials in rail and road transport, the evaluation of rail and road accessibility of the access points as well as the identification of deficits and development potentials respectively. The results were presented in GIS-based maps. | ||
|
||
2008 |
Implementation of the intermodal transport relationship between Rottterdam (NL) and Frankfurt/Oder | ITL Eisenbahngesellschaft mbH |
scope of services: In order to complement the former connections to the intermodal terminals Frankfurt/Oder, a direct rail connection was established between the three terminals of the Rotterdam Port Pernis Combi Terminal (PCT), Maasvlakte-Terminal, APM Delta Termina and the intermodal terminal Frankfurt/Oder. Therefore LUB wrote a grand application according to the policy for funding of new connections for intermodal transport on rail- and waterways, on behalf of ITL Railroad Company Ltd. The Frankfurt/Oder region was supposed to get connected to the seaport Rotterdam. The application was approved and the connection has established itself in the market. | ||
|
||
2007 |
Feasibility study of intermodal connection Rostock- Prague | Hafenentwicklungsgesellschaft Rostock mbH |
scope of services: evaluation of the transport demand using statistical data and perspective for transport development; examination of the technical feasibility, the availability of the necessary resources; commercial implementation (marketing) | ||
|
||
2006 |
Implementation of the intermodal transport relationship between freight village Dresden and Port Hamburg (Emos Spedition GmbH) | Emons Spedition GmbH |
scope of services: In October 2006 the first regular intermodal connection between the freight village Dresden and the Hamburg Port was established. The Emons Spedition in collaboration with the haulage operator the ITL Eisenbahngesellschaft mbH (Railway Company) activated the route between Dresden and the Hamburg Port. Today there is a stop in hall and a feeder link between the halls and the Freight Village Erfurt. In order to implement this project the LUB Consulting GmbH developed the market potential analysis and successfully applied for funding to the Federal Railway Authority (Eisenbahn-Bundesamt). Thanks to this applying for funding and analysed potential, in october 2006 the project could be realised and the intermodal connection has been successfully used till today. |
Expert Consultancy
Year | Project Title / Cooperating Partner | Client |
2014 - 2015 |
Development of LEADER Development Concept for LEADER Vogtland Region for the funding period 2014-2020 | VogtLandZukunft e.V. |
scope of services: Creation of the LEADER development concept for the LEADER Vogtland region for the funding period 2014-2015 | ||
|
||
2014 - 2015 |
Tasks of coordination in the framework of the EU-Study „Preliminary Planning Services new high speed rail line Dresden – Prague” | Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: The coordination comprises consulting and support in the matter of planning and implementation regarding preliminary planning services of the border crossing route section between Heidenau (D) und Ustí n.L. (CZ). This includes among others the reporting versus the EU, the participation at project meetings as well as the support of the project website. | ||
|
||
2013 - 2015 |
EcoHubs - Environmentally COherent measures and interventions to debottleneck HUBS of the multimodal network favoured by seamless flow of goods (www.ecohubs.eu) Project in the EU's 7-th Framework Programme | Deutsche GVZ-Gesellschaft mbH |
scope of services: Development of the ecological balance sheets for the intermodal terminal processes using as example the selected freight villages, based on the tools developed in the project:
|
||
|
||
2011 - 2015 |
Creation of a grant application for the Marco Polo II Programme Marco Polo II |
BLG AutoRail GmbH |
scope of services: Complete preparation of the application for the submission to the EU-programme Marco Polo II in 2011. Objective was a start-up financing for the modal shift of car transports from road to rail, on the route Emden - South Eastern Europe. After the successful grant application LUB accompanied the process of verification till the successful completion of the process of funding in 2015. | ||
|
||
2014 |
HILDE 'Hinterland solutions by improving efficiency between Hamburg and Saxony' | Saxon State Ministry of Economic Affairs, Labour and Transport; LISt Society for Transportation and Engineering Services |
scope of services: The task of LUB was the creation of the potential analysis, elaboration of approaches related to infrastructure development and to modal shift in intermodal transport between Saxony and Hamburg
|
||
|
||
2013 - 2014 |
Analysis of the macroeconomic effects of railway route Dresden-Prague | In sub-contracting of ProgTrans AG; main client was: Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services:
|
||
|
||
2012 - 2014 |
Elaboration of grant applications according to the Saxon EFRE funding guidelines for the intermodal railway connection between Freight Village Dresden and the Port Rotterdam | Emons Spedition GmbH |
scope of services:
|
||
|
||
2013 |
Intermodal freight railway connection between the Port of Rostock and Dresden-Friedrichstadt as a part of a new railway system between Scandinavia, Eastern and South-Eastern Europe | Kühne + Nagel (AG & Co.) KG |
scope of services: For the implementation of a intermodal freight railway connection between the port of Rostock and Dresden-Friedrichstadt as a part of a new railway system between Scandinavia, Eastern and South-Eastern Europe, the LUB elaborated a grant application according to the SMWA funding guidelines for the funding of transport infrastructure financed by the European Regional Development Fund. The aim of this transport connection was the modal shift from the road to the rail freight transport between the Port of Rostock and Freight Village Berlin-West (Wüstermark) and Freight Village Dresden involving the regional rail ports in feeder traffic (for example Glauchau ). The application was successfully applied and the requested funding was granted. |
||
|
||
2013 |
CONventional Goods TRAnSporT in Single Wagon Load | Kühne + Nagel (AG & Co.) KG |
scope of services: For the Project CONTRAST der Kuehne + Nagel (AG & Co.) KG created the LUB Consulting GmbH a Marco Polo grant application of the EU. The project includes a "Modal Shift Action" in a single wagon load traffic between Scandinavia and South-Eastern Europe. It should be an optimized solution for single wagon traffic along the shortest path. The corridor connects Rostock Wustermark (LVN West Berlin) and Dresden-Friedrichstadt (FV Dresden) with Bad Schandau / Czech border. From there, the corridor leads to Breclav (CZE) and Vienna (AUT) and to Sopron (HUN). From here, the goods are transported in block trains to the destinations in the Balkans and Turkey. The innovative approach of the corridor is mainly that the train does not operate between marshalling yards, but between so-called Railports. In this context, a market survey along the corridor was developed, which was the basis for the application process. On the basis of the market survey and inventory amounts of Kuehne and Nagel, a comprehensive business plan for the entire duration of the project was created. Based on the forecast transport volume displaced over the project period, the amount of funding was calculated and applied in the 3rd quarter of 2013. |
||
|
||
2013 |
Feasibility study for the construction of intermodal land bridges between the Port hinterland Frankfurt (Oder) and sites in Belarus, Russia, Ukraine and Kazakhstan | Investor Center Ostbrandenburg GmbH |
scope of services: The aim was the development of intermodal transport chains between the EU and Eastern Europe as a part of the EU Interreg IVB project Amber Coast Logistics (ACL), operating under the coordination of the Hamburg Port Marketing (HHM). Within the framework of the project the market analysis is created and the potential cooperation partners for the location Brandenburg / Frankfurt (Oder) are identified. Based on discussions with interested partners, especially the operators and logistics villages, the feasibility study should be created for the construction of intermodal land bridges between the hinterland Frankfurt (Oder) Port and the locations in Belarus, Russia, Ukraine and Kazakhstan. |
||
|
||
2012 - 2013 |
Feasibility Study for container handling using mobile equipment in Arneburg Port: The testing of mobile handling equip-ment (Reach Stacker) used for container handling by inland waterway vessels and for the container parking area in the port | Stadt Arneburg/Elbe |
scope of services:
|
||
|
||
2012 - 2013 |
Application documents for the preliminary planning of a new line Dresden-Prague for the TEN-T project 2011 and 2012 | Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: Preparation of the application documents for preliminary planning of a new line Dresden-Prague as a part of the project TEN-T Achse 22. In 2013 the study was submitted for funding, under priority "Acceleration / facilitating the implementation of TEN-T projects" |
||
|
||
2010 - 2013 |
QUALIST - Improving quality of life in small towns, in collaboration with: ISUP Dresden |
Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: The LUB Consulting GmbH acts as a responsible project coordinator of the project "QUALIST - Improving Quality of Life in Small Towns", on behalf of the State Ministry of Economic Affairs, Labour and Transport of Saxony. The project, in the framework of the EU program "Central Europe", includes solutions to improve the attractiveness of small towns with partners from Germany, the Czech Republic and Austria. The aim of the measures is to increase the quality of life of the residents and to attract potential new residents. |
||
|
||
2010 - 2013 |
BATCo – Baltic-Adriatic Transport Cooperation, WP 5: Logistics Development (gefördert im EU-Programm Central Europe), in cooperation with ISL Bremen | Deutsche GVZ-Gesellschaft mbH Entwicklungsagentur Kärnten GmbH |
scope of services: The scope of services include collection and processing of data of handling terminals, logistics centres and logistics operators along the BATCo corridor, the establishment of organizational and administrative framework for the proposed concept "Transnational Logistics Centre Incubator (TLC)" as well as its implementation in the location ALPLOG Carinthia. |
||
|
||
2011 - 2012 |
Apply for funding for the extension of the intermodal terminal (rail-road) in Dörpen (Freight Village Emsland) | Dörpener Umschlaggesellschaft für den kombinierten Verkehr mbH (DUK) |
scope of services:
|
||
|
||
2011 |
Planning of a static signage for the 3 corridors to realise the truck management concept of Dresden, in cooperation with: ISUP Dresden |
Landeshauptstadt Dresden |
scope of services: Traffic planning services for the development of static signage for the truck management based on the truck management concept of Dresden. Development of route guidance and signage plans for the corridor from BAB-AS to the associated industrial zones in two versions: "official signage", integrated into existing signposts and "unofficial signage" (= external). Recommendation of the preferred variant based on the evaluation of cost and efficiency. |
||
|
||
2010 |
Preparation of a grant application for the Marco Polo II program |
Mosolf Automotive Railway GmbH |
scope of services: The subject-matter of the services was the development of applications for start-up funding of modal shift of freight from road to rail in the transport relationship between Poland and Belgium. |
||
|
||
2010 |
Application for funding according to the funding guidelines for combined transport "Extension of the container terminal Herne (CTH)" | CTH Container Terminal Herne GmbH |
scope of services:
|
||
|
||
2010 |
Application for funding according to the funding guidelines for combined transport "Extension of the intermodal terminal Frankfurt (Oder)" | Investor Center Ostbrandenburg GmbH |
scope of services:
|
||
|
||
2010 |
Evaluation of previous studies on the navigability of the Elbe and Saale in the context of the EU INTERREG project LABEL, in collaboraton with: UNICONSULT Hamburg |
Ministerium für Landesentwicklung und Verkehr Sachsen-Anhalt |
scope of services: For the European Community project LABEL was made the evaluation of cur-rent studies on the subject of inland navigation, to merge these studies and identify the gaps in the current research. For each of the 69 studies was created a short summary of the relevant results as well as the overview and analysis based on an evaluation matrix. |
||
|
||
2010 |
Feasibility study for a trimodal transhipment facility at port Arneburg | Stadt Arneburg/Elbe |
scope of services: The feasibility study was to investigate the technological and economic feasibility of a tri-modal transfer station with its own harbor loading equipment. For this purpose, the potential and the requirements of the local catchment company was acquired and derived the dimensions and technical configuration of the trimodal handling facility. Further variants were evaluated for an operator model. |
||
|
||
2009 - 2010 |
Application for the QUALIST project submitted to the Central Europe Programme. | Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: LUB was commissioned to form a project consortium and to develop the project application. The whole application process was supervised by LUB, under the terms of the Central Europe Programme 2015. The application was approved in fall 2009, subject to conditions. LUB participated in developing project objectives and contets of QUALIST, on wich all german, czech, and austrian partners agreed. The wide knowledge about the charateristics of the saxon region and the good relations to the czech partner ARD were contributing to the success. The QUALIST project focuses on mesures to tackle challenges of small towns, challenges caused by decreasing economy and population. |
||
|
||
2005 - 2009 |
Professional supervision of the expert group "rail freight transport in the pan-european transport corridor III" | Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: The expert group works on intensification of the rail freight transport in the corridor, particularly with regard to harmonization of technical standards for infrastructure and border traffic (i.e. transition standard to wide gauge), and on the establishment of innovative competitive transport offers. |
||
|
||
2006 - 2008 |
Truck-route concept for the city area in Dresden |
Landeshauptstadt Dresden |
scope of services: Development of a strategy for the individual and collective routing of truck traffic. Conclude preferred routes; analyzing the potential for traffic reduction; analyzing the acceptance by the drivers, freight forwarders, and shippers; development of an implementation strategy; estimation of implementation costs; creation of a truck-city-map to publish the routes |
||
|
||
2006 - 2008 |
EU-CORe III - Harmonisation of economic and infrastructure development in the Pan-European Transport Corridor III (Interreg III B Cadses) |
Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: Development of a regional development strategy for the German part of the pan-european transport corridor III (PEK II) with focus on regional connection lines. Supervision of the contribution from the project partners; professional lead of a transnational expert group for the evaluation and prioritization of infrastructure projects and other measures from the regional strategies; development of a transnational development strategy. |
||
|
||
2007 - 2008 |
Master plan freight transport and logistics |
Bundesministerium für Verkehr, Bau und Stadtentwicklung |
scope of services: Analyzing the state of the system and identify the needs for action; analysis of the strengths and weaknesses of Germany as logistic location; identifying and valuating areas of activity; defining areas of activity and recommended actions; valuation and prioritization of measures; preparation and arrangement of expert workshops |
||
|
||
2006 - 2007 |
Trans-EA – Efficiency assessment of cross-border transport infrastructure (Interreg III C) |
Saxon State Ministry of Economic Affairs, Labour and Transport |
scope of services: Analysis of cross-border traffic and its volume, in the public transport and freight transport sector, between Germany, Poland, and Czech Republic; development of the Trans-EA method for valuation of cross-border infrastructure for the use of regional players, it includes infrastructural and operational measures; test of Trans-EA under the circumstances of the Free State of Saxony; professional supervision of an expert group with project partners from Poland and Finland, including modification of the method to meet the requirements in this counties. |
||
|
||
2007 |
Analysis of economic and traffic-wise potentials of the North -South Railway Corridor |
Ministry of Economic Affairs, Labour and Transport of Saxony |
scope of services: Scientific statements about the necessity of the corridor development, from an infrastructural and economical point of view. Analysis of existing transport offers and the utilization of the passenger and freight transport (focus on international passenger long-distance transport and seaport hinterland transport from the seaports at the north sea); Conduct the demand trend of passenger and freight transport from the demographic and economic tendencies of the regions in the corridor; analysis of existing railway infrastructure (bottle necks) and planned upgrades in the corridor; compilation of a catalog of requirements for the development of infrastructure in the corridor |
||
|
||
2007 |
Preparation of tender documents for the operation of the ro-ro transshipment facility at port Dresden | Sächsische Binnenhäfen Oberelbe GmbH |
scope of services: Analysis of the traffic volume and profitability of the facility; visualization of the operating program; preparation of the explanatory report and further tender documents |
||
|
||
2006 |
Study about the potential for inland waterway transport in the Elbe river area and its development opportunities |
Verein zur Förderung des Elbstromgebietes e.V./ Bundesverband öffentlicher Binnenhäfen e.V. |
scope of services: Analysis of the framework conditions regarding navigability and economical capability of inland waterway transportation and inland ports in the Elbe river area; valuation of traffic volumes and forecasts for freight transports |
||
|
||
2006 |
Analysis of the potential for the upgrade of the port Mühlberg with focus on measurement cargo and havy-duty transports | Glahr & Co. GmbH, Potsdam |
scope of services: Measurement cargo and heavy-duty transports; determination of the potential traffic for the port in Mühlberg; economic feasibility study; analysis and determination of funding possibilities and demand |
||
|
||
2006 |
Evaluation of the cordon Äußere Neustadt | Landeshauptstadt Dresden |
scope of services: Traffic counting to evaluate volume and routes in a cordon; technical and administrative preparation of the evaluation; analysis and interpretation of the data |
||
|
||
2006 |
Evaluation of transport flows in Dresden |
Landeshauptstadt Dresden |
scope of services: Evaluation of traffic flows and vehicle types in the city area of Dresden; technical and administrative preparation of the evaluation; analysis and interpretation of the data |
Research and Development
Year | Project Titel / Cooperating Partner | Client |
2012 - 2014 |
Freight Village climate protection benchmarking by the example of selected Freight Villages in Germany, in cooperation with: ISL Bremen |
Funded by the Federal Ministry for Environment, Conservation and Reactor Safety |
scope of services: Objective of the project is to identify measures that contribute to the energy efficiency in German Freight Villages and to transfer this knowledge to other Freight Villages. A survey was held with the operators of and the companies within the Freight Villages. It is intended organize roadshows to establish the best solutions in as many German Freight Villages as possible. |
||
|
||
2010 - 2013 |
Process-oriented model to support coordination in the case of incidents for participatory decisions in dynamic networks - PreparedNET, in cooperation with ISL Bremen and Emons Spediton |
Federal Ministry for Education and Research (BMBF) |
scope of services: Research, configuration and exemplary implementation of an emergency concept to maintain the transport flows after terroristic attacks or other disasters, using the example of the Freight Village Bremen in cooperation with the Freight Village Dresden. |
||
|
||
2010 - 2012 |
Effects of the Freight Villages in Germany, in cooperation with: ISL Bremen |
Federal Ministry for Transport, Building, and Urban Development |
scope of services: The subject of the report was the traffic-wise, economic, and environmental effect, which are connected to the implementation of Freight Villages. The report should contribute to the implementation of the 4D initiative "initiative for logistics in urban areas" of the action plan 'freight transport and logistics'. Among other things the effects from Freight Villages as logistic interface for supply transports in urban areas was examined. |